Hi all, it’s been awhile but it’s been soooooooooooooo busy! I rode a spinning marathon the day before our Big Move, it was great! The Big Move was too 🙂 Busy at work, like insanely, plus projects with deadlines, some (minor) health issues though not very pleasant, and some more stuff going on have made these past few weeks quite something. In between the darkroom and studio are coming together nicely.
We hung the background paper yesterday, all it really needs is lights set up, the table top set up and I’m good to go there! During the day it looks like this (taken from the “office” part where I have my scanner, printer etc. set up):
This is what it looks like when looking from the doors towards the inside of the space:
And here’s with the background paper (2,75 seems so small now haha) hanging and me being happy 🙂
When you look in the back of the second photo you can see the stairs going up all the way on the left and on the right is an opening. This leads to a short kind off hallway which leads to two cellars. One is my darkroom. On the hallway is a bit more storage space for our things.
The working table has been fixed, big trays stacked underneath it as is the large container with sodium thio-sulphate and a bin. The wet table still has to be connected, waiting for a hot water boiler to arrive. When that’s done I can fill up the storage space beneath them.
Shelves have been hung (quite the challenge with these marl walls!) but it’s there! Chemistry has been unpacked, everything is a bit in place now. Darkroom safelights still have to be mounted, certain chemistry fixed etc. and I can roll again! During actual working in this space things will probably get moved around a little to improve working but it’s pretty nice already I guess 🙂 Have to find a place for my large papers but that will fit in once the time is there. Also, the big white board needs to be mounted to the wall…I hope it will hold…trick so far: no plugs, just screw directly into the wall.
Anyway, looking forward finishing this! I have a proper shoot planned at the end of this month. Need some new collodion first (which is on its way but will not arrive before March 23nd) and need to desperately fix my silver bath. Already have a large erlenmeyer and cooking plate to do that. This week it’ll have to happen as well as the first collodion test as I have been invited by Gulpener Bier brewery to photograph their brewery on collodion for their “PUUR” magazine with a (short) interview of me. Will have to be shot this Sunday / Monday but so cool I’ll have to make my stuff work before then. Only will have to shoot small plates as I’m practically out of collodion oehh…. 🙂
❤💕❤
wonderful darkroom and ssetup!
YES! This looks amazing! Congratulations Indra, daaaarling! Needles to say, Indra for president!
Yihaaa thank you Borut!
I feel a bit of envy!
Wonderful Atelier, I am sure you’ll make a good profit of it. Congrats!
No need to Jesus, but thank you 🙂 I am enjoying it quite a bit! By the end of this week my wet table will be in full working order again so I can roll for a 100% then 🙂